The Lagoon Road and Avocet Road pathway projects were constructed at the same time for efficency and money savings.

Lagoon Road Pathway

The Lagoon Road multi-use pathway was constructed from the intersection of Lagoon Road and Pope Avenue connecting to the pathway at the Avocet and Lagoon Road intersection. The project provided a new multi-use pathway down the west side of Lagoon Road and ending at the intersection of Lagoon and Avocet Roads. This pathway project required a small amount of storm water drain inlet redesign and when completed a multi-use pathway was constructed along Lagoon Road shoulder. The scope of work involved taking an existing roadway shoulder and ditch, clearing undergrowth, extending some of the storm water drain system as needed and the redesigning of some of the existing inlets, relocating some of the utilities as needed, grading, and installing the base and final layers of pathway materials.

Avocet Road Pathway

The Avocet Road multi-use pathway was constructed from the intersection of Lagoon Road and Avocet Road connecting to the existing pathway at the Avocet and North Forest Beach intersection. The project provided a new multi-use pathway down the entire south side (Coligny Plaza side) of the road and extending a small section of an existing walkway on the north side of Avocet Road between The North Shore Development and Sea Crest Racquet Club. This pathway project involved a small amount of storm water drain inlet redesign and when completed a multi-use pathway was constructed along Avocet Road shoulders. The scope of work required taking an existing roadway shoulder and ditch, clearing undergrowth, extending some of the storm water drain system, relocating some of the utilities as needed, grading, and installing the base and final layers of pathway materials.

Pathway Project Facts

Lagoon Road Pathway
  • Approx. 950 linear feet of pathway comprising of asphalt, concrete pathways and color stamped asphalt crosswalks
  • Installing storm drain system along the pathway
Avocet Road Pathway
  • Approx. 770 linear feet of pathway comprising of asphalt, concrete pathways and color stamped asphalt crosswalks
  • Installing storm drain system along the pathway
  • Project Start Date: January 2010
  • Completion Date: April 2010

Project Area Map

Lagoon and Avocet Road Pathway Project Area Map

Project Photos

Lagoon Road
Photo of Lagoon Road South Before Construction
Lagoon Road South Before Construction
Lagoon Road Pathway Construcction Photo
January 26, 2010
Lagoon Road Pathway Construction Photo
February 12,2010
Photo of Lagoon Road Pathway Construction
Feberuary 12, 2010
Photo of Lagoon Road Pathway Construction
February 22, 2010
Photo of Lagoon Road Pathway After Construction
Lagoon Road South Pathway
Photo of Lagoon Road Pathway After Construction
Lagoon Road Pathway
 
Avocet Road
Photo of Avocet Road West Before Construction
Avocet Road West Before Construction
Photo of Avocet Road Drainage Construction
March 15, 2010
photo of Avocet
April 19, 2010
Photo of Avocet Road Pathway Construction
April 26, 2010
Photo of Avocet Road Pathway Construction
May 10, 2010
Photo of Avocet Road Pathway After Construction
Avocet Road Pathway
Photo of Avocet Road Pathway After Construction
Avocet Road Pathway
Photo of Avocet Road Pathway After Construction
Avocet Road Pathway

Project Manager: Bruce Skipper email icon, Engineering Technician II - (843)341-4778