Planning, Development & Building ConstructionInspection Item Numbers

Foundation Rough-in
025 Footing - Res   155 Complete-all RI inspections - Res
325 Footing - Com   455 Complete-all RI inspections - Com
027 Block - No Survey/Rebar   100 Rough in Framing - Res
028 A-Zone Pilings   400 Rough in Framing - Com
029 V-Zone Pilings - Res   110 Rough in Plumbing - Res
329 V-Zone Pilings - Com   410 Rough in Plumbing - Com
030 Block/Survey/Rebar - Res   120 Rough in Electrical - Res
330 Pier/Block/Col/Pilings/Reb - Com   420 Rough in Electrical - Com
031 Pile Caps - Res   130 Rough in Heating/Air - Res
331 Pile Caps - Com   430 Rough in Heating/Air - Com
032 Grade Beam - Res   090 Strapping/Anchor Bolts - Res
332 Grade Beam - Com   390 Strapping/Anchor Bolts - Com
040 Rebar - Res   036 Fire Stopping
340 Rebar - Com   095 Hurricane Clips - Res
050 Underground Plumbing - Res   395 Hurricane Clips - Com
350 Underground Plumbing - Com   035 Firewall-Res
051 Underground Electrical - Res   335 Firewall - Com
351 Underground Electrical - Com   036 Fire-Draft Stop - Res
052 Underground HVAC - Res   336 Fire Stopping - Com
352 Underground HVAC - Com   038 Flashing-Windows/Doors
060 Pour Garage Slab - Res   338 Flashing - Commercial
360 Pour Garage Slab - Com   049 Shower Pan Inspection
070 Slab Monolithic/Floating-Surv Req - Res All Other Inspections
370 Pour Slab - Com   133 MDHOM/MH Hook-up
071 Slab Monolithic/Floating-No Survey   333 MODBO Mech Hook-up
080 Sub Floor - Before Nailing - Res   210 Installation Manufactured Home
380 Pre Sub Floor - Com   270 Pool/Spa Grounding
482 Bond Beam   271 Pool/Spa Deck
Other Building Inspections   273 Equipotential Bonding
010 Temporary Service - Res   280 Suspended Deck Pier/Blk/Col
310 Temporary Service - Com   285 Suspended Deck prior to pour
105 Ceiling Cover Up - Res   275 Pool/Spa Final
405 Ceiling Cover Up - Com   260 Irrigation Final
115 Plumbing Re-Pipe - Res   250 HVAC Change Out
415 Plumbing Re-Pipe - Com   165 Elec Serv Change Out - Res
136 Hood Firewall   465 Elec Serv Change Out - Com
140 Insulation - Res   220 Roofing
440 Insulation - Com   20 Demolition
141 Shear Wall - Res   255 Tent/Air Structure
441 Shear Wall - Com   265 Building Safety Inspection
160 Permanent Service - Res   178 LP Gas Tank Installation
460 Permanent Service - Com   158 Planning Site Inspection - General
135 Gas Piping Certification - Res   159 Urban Design Inspection
435 Gas Piping Certification - Com   161 Sea Turtle Inspection
157 Stucco Flashing/Mesh - Res   162 Natural Resource Inspection
457 Stucco/Mesh/Flashing - Com   163 Stakeout Inspection
220 Roofing   191 Elevator Shaft
097 Nailing - Res   192 Elevator Inspection
397 Nailing - Com   356 Elevator Certification Required
196 Flood Proofing Inspection   459 Pre PS Site Inspection
197 Floodplain Inspection   200 Compliance Inspection
170 Final Inspection - Res
470 Final Inspection - Com
180 Certificate of Occupancy - Res
480 Certificate of Occupancy - Com
Fire    
054 Underground Hydrostatic
055 Underground Storage Tank
056 Underground Pressure Test
057 Product Line Test
058 Underground Tank Final
111 Aboveground Hydrostatic Test
112 Fire Sprinkler Head Placement
113 Fire Standpipe Location
228 Underground Flush
231 Smoke/Heat Detector Placement
232 Fire Alarm Activation Test
233 Fire Sprinkler Sys Flow Test
234 Fire Standpipe Flow Test
236 Fire Pump Test
237 Hood Sys Dry Activation
238 Fire Extinguisher Placement
240 Fire Safety Ceiling Cover-up
182 Occupant Load Sign
241 Clean Agent Extinguishing Sys
229 Sprinkler Pipe
242 Knox Box Installation
436 Hood Firewall - Com
437 Hood Light/Duct Test - Com
230 Fire Safety Final
235 Fire Safety C/O