Coligny Area Roadway Improvements

Project Details
Status:   Under Construction   Under Construction Icon

Project Area Map

Project Description

(Nassau Street, South Forest Beach, Lagoon Road Extension, Pope/Lagoon Intersection-Traffic Signal)

Various Roadway Improvements – new traffic signal at Pope-Lagoon, improved turn lanes on Pope Avenue, extending Lagoon Road into new park and adding on-street parking.

Pathway Reconstruction along Tanglewood Drive, and a new pathways along the Oceanside of South Forest Beach Drive from Coligny Beach Park to Tanglewood Drive.

Related CIP Project:

Lowcountry Celebration Park (Coligny Area Redevelopment Initiative)

Project Objectives

To improve traffic and pedestrian capacity and safety and support other public projects and economic development in this initiative area.

Additional Documents


Subscribe to Updates
e-subscription iconTo sign up for email updates, enter your email address below.


Projected Project Schedule:  

Design/Permitting: Summer 2015 - Spring 2016

Projected Construction Start Date:  September 2018

Estimated Completion Date:  June 2019

Project Engineer:  Thomas & Hutton Engineering Company

Construction Contract Awarded To:  Quality Enterprises

Funding Sources:  TIF

Estimated Cost of Project:  $4.82 million

Project Manager:  

Jennifer Lyle email icon, Assistant Town Engineer, 843-341-4779


Project Updates
  • What Happened the Week Ending December 7, 2018

    • Trees Removed behind Coligny Beach Parking Lot
    • Tree Removal on Nassau Street
    • Asphalt Full Depth Patching on Pope Avenue began (lane closures on Pope Ave)

    What's Happening the Week of December 10, 2018

    • Continued asphalt full depth patching on Pope Avenue (lane closures on Pope Ave)
    • Tree Removal on Nassau Street, Tanglewood Drive, and South Forest Beach Drive

    Pope Ave Asphalt Patch Locations Maps

  • What Happened the Week Ending November 30, 2018

    • Tree Removal for Relocation of Palmetto Electric power lines
    • Marking of trees to be removed for roadway projects
    • Marking of full depth asphalt patching for Pope Ave resurfacing

    What's Happening Next Week

    • Tree Removal Lagoon Road extension / Park entrance and Nassau Street Reconstruction
    • Full-depth asphalt patching on Pope Avenue, in advance of resurfacing
  • What Happened the Week Ending November 2, 2018

    • Utility Coordination with Palmetto Electric conducted to relocate existing electrical lines in conflict with new electrical lines that will run through the new Low Country Celebration Park.
    • Coordination with the contractor for additional tree removal that was allocated for the Park to assist in stormwater removal.

    What’s Happening the Week Ending November 9, 2018

    • Tree Removal on Coligny Beach parking lot and Nassau Street
  • What Happened the Week Ending October 26, 2018

    • Construction staking on Coligny Beach parking lot for the intersection of Pope Ave and Lagoon Rd completed.
    • Sediment and Erosion Control and Tree Protection in place on Coligny Beach parking lot for the intersection of Pope Ave and Lagoon Rd.
    • Pre-Clear Inspection completed for work to occur on Coligny Beach parking lot and tree removal construction entry between Nassau Street and Coligny beach parking lot.
    • Tree protection fence installed on Nassau Street and trees marked on Tanglewood Drive for tree protection or removal.
    • Utility coordination with Palmetto Electric and SIPSD for new stormwater infrastructure conducted.

    What's Happening Next Week

    • Tree Removal on Coligny Beach parking lot and between Coligny Beach parking lot and Nassau Street
    • Pre-Clear Inspections for Nassau Street
  • 10/3/2018 - Pope Avenue Entrance to Coligny Beach Parking Lot Closed for Improvements
    As part of the Coligny area roadway improvements project, the Pope Avenue entrance to the Coligny Beach parking lot will be closed until further notice. During this time, the parking lot must be accessed from South Forest Beach Drive. more information...

Project Photos & Videos
  • Photo of Asphalt Shoulder Patchwork on Pope Avenue
    Asphalt Shoulder Patchwork on Pope Avenue - 12/6/2018
  • Photo of Tree Removal at Coligny Beach Parking Lot
    Tree Removal at Coligny Beach Parking Lot - 12/6/2018
  • Photo of Tree Removal Work at Coligny Beach Parking Lot
    Tree Removal Work at Coligny Beach Parking Lot - 12/6/2018
  • View More Photos...